The Restoration Dept has at last finished adjusting, flattening and anchoring the partition wall and installing the interior paneling, all prerequisites for installing the stairs. The newels that support the upper flight have had 3 inches of height added to their bottoms and are anchored to the floor. The lower flight had to have new carriages, made in kind with heart pine, then set in place. Two winders, two treads and two risers are all thats left to complete the stairs.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment